third-party bid, not second-party self-performance. If you're the
engineer who ostensibly works for the constructor, how do you approach
specifications?
The "mandatory wording" is typical for a contractual relationship, but
there is no "contract" between the engineer and the builder who work for
the same boss.
******* ****** ******* ******** ******* ******* ******* ***