Engineering Observation for several portions of construction by the Engineer of Record, as progress occurs, is a requirement of the Bldg. Dept(s). prior to the City inspection by Bldg. Dept. inspectors. For typical projects such as a second story addition, two Structural Inspections are required: one prior to footing concrete placement and one when framing is completed by not covered by drywall.
Stan Scholl, P.E.
Laguna Beach, CA