Bill,
Ascetics aside (i.e. the visible crack line from the joint) you will need to assume the soil under the slab settles and the horizontal rebar across the cold joint will need to take all the slab vertical loads such as a certain portion of slab dead weight, floor live load, and/or any vehicle/forklift loads.
Thomas Hunt
"Bill Allen" <T.W.Allen@cox.net> 05/22/2007 02:36 PM Please respond to seaint |
|
Dear colleagues,
A contractor has requested an alternate cold joint location. In the sketch found in the link below:
http://www.allendesigns.com/projects/20603/20603AlternateColdJoint.gif
Alternate A is the method shown on the approved plans.
Alternate B is what the contractor wants to do.
The dowels match the slab bars.
Should I have a concern about the request?
Regards,
T. William (Bill) Allen, S.E.
ALLEN DESIGNS
Consulting Structural Engineers
V (949) 248-8588 • F(949) 209-2509
------------------------------------------------------------ The information transmitted is intended only for the person or entity to which it is addressed and may contain proprietary, business-confidential and/or privileged material. If you are not the intended recipient of this message you are hereby notified that any use, review, retransmission, dissemination, distribution, reproduction or any action taken in reliance upon this message is prohibited. If you received this in error, please contact the sender and delete the material from any computer. Any views expressed in this message are those of the individual sender and may not necessarily reflect the views of the company. ------------------------------------------------------------