ACI 530 calls for cleanouts @ 32" max. o.c. with a 3" min. dimension for grout pours over 5'-0" in the execution part of the document.

----- Original Message -----
From: "Doug Mayer"
To: seaint@seaint.org
Subject: High lift grouting
Date: Fri, 25 May 2007 10:25:20 -0700

List,

 

I have a CMU wall building in Washington (state) being built that has fully grouted walls and reinforcing at 8" o.c. each way.  The contractor wants to do high lift grouting in lieu of the low-lifts, which is fine with me.  However, the topic of cleanouts has become an issue and I'm not sure of the correct answer.  

 

They would like to do cleanouts at 32" o.c., but I know that older codes and the Concrete Masonry Association of California and Nevada specify that cleanouts are to occur at each vertical cell with reinforcing, or continuous special inspection is to be provided.  But, looking at the IBC 2003 and ACI 530-02 – the codes for this project – I can't seem to find any reference or specification for cleanout requirements.  Any ideas?

 

Thanks for the help,

 

Doug Mayer, SE

Structural Engineer

 

TaylorTeter

Partnership

 

 

 



Bart Needham, SE Principal, nbse associates, inc. Office 206-780-6822 Office 805-452-8152 Fax    206-780-6683 Fax    208-693-3667 Mobile 206-300-2346  Office locations: 629 State Street #230 Santa Barbara, CA  93101  205 Fairview Lane Suite 100 Paso Robles, CA  93446  365 Ericksen Ave. NE Suite 328 Bainbridge Island, WA  98110  Mail and Deliveries: 321 High School Rd. NE Suite D-3 PMB 216 Bainbridge Island, WA  98110