Is there a code requirement that says that rebar in a slab or footing has to be grounded? I have an electrical engineer telling me NEC says so.
Al Greene, PE, SECB
Chevron Richmond Refinery
841 Chevron Way, 244/Tech Center
Richmond, CA 94802
Phone: (510) 242-1788
Fax: (510) 242-2509
Cell: (510) 507-5080
agfo@chevron.com