I have been asked about the need to wait 7 days before placing a concrete wall on a new footing. Is this an enforcable requirement referenced by the code? Or this only a guide and a "proceed at your own risk" situation if placing the wall before receiving 7-day breaks on the footing?
And is there a similar requirement that forms cannot be erected on a footing until 3 days after footing placement?
Jim Wilson, PE