RE: Backing bar in RBS steel moment connection

As usual excuse my ignorance, but why only the bot. flange?
 
MB
-----Original Message-----
From: bart@nbse.com [mailto:bart@nbse.com]
Sent: Friday, May 18, 2007 11:47 AM
To: seaint@seaint.org
Subject: RE: Backing bar in RBS steel moment connection

At the beam bottom flange, the backing shall be removed.
 
At the top flange, removing the backing is optional. (continuous attachment to the column with a fillet weld is required)
 
My opinion is that leaving backing bars in place is a poor idea, however, it is often cost prohibitive to remove them, backgouge and backweld with a reinforcing fillet.

----- Original Message -----
From: "Gautam Manandhar"
To: seaint@seaint.org
Subject: RE: Backing bar in RBS steel moment connection
Date: Mon, 7 May 2007 14:55:31 -0700

List members:

 

In a RBS steel moment connection, the expected plastic hinge is at the reduced beam section.  How important is it to remove the backing bar at the beam-column connection?  I am aware that in the pre-Northridge, fracture initiated at the bottom CJP joint.   Is anyone aware of tests done with the backing bar in place.

 

Gautam

 

 



Bart Needham, SE Principal, nbse associates, inc. Office 206-780-6822 Office 805-452-8152 Fax    206-780-6683 Fax    208-693-3667 Mobile 206-300-2346  Office locations: 629 State Street #230 Santa Barbara, CA  93101  205 Fairview Lane Suite 100 Paso Robles, CA  93446  365 Ericksen Ave. NE Suite 328 Bainbridge Island, WA  98110  Mail and Deliveries: 321 High School Rd. NE Suite D-3 PMB 216 Bainbridge Island, WA  98110