Chris:
In California I understand that any excavation 5’-0” deep and deeper needs shoring. I would confirm that with the OSHA documents. I also understand that the fine for not shoring according to code is substantial.
Respectfully,
Bob Freeman
Architect
Structural Designer
Integrated Design Services, Inc.
(949) 387-8500