Thanks Barry,
Feel free to answer without one or more of the conditions I stated if you think that is a more interesting case. I get a lot of those situations too.
This just seems to be the most restrictive case and I’m wondering what my liability might be if say a roof blows off and it is discovered that the building was recently renovated and the engineer didn’t specify any retrofit even though it might have been easily done.
Christopher Banbury, PE
President
Ark Engineering, Inc.
Phone: (352) 754-2424
Fax: (352) 754-2412