Tuesday, October 9, 2007

Re: Foundations for a 3-pinned arch stadium

Kevin,
I did a pre-eng bldg almost as big as yours several years ago. The
contractor wanted tie rods to cut down the size of the footings, He said
he would never do that again. We had two 2" diam tie rods that had to
be embedded in a separate conc trench. As the distance was something
like 160', we had to use turnbuckles to tighten the rods and welded some
of the pieces together. He said the cost of more concrete would have
been cheaper and faster.
Gary

Kevin Below wrote:
>
> What about a tie-rod (it would need to be big) under the sports
> surface, tying the 2 sides together ?
>
> Kevin
>
> kbofoz
>

******* ****** ******* ******** ******* ******* ******* ***
* Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
* This email was sent to you via Structural Engineers
* Association of Southern California (SEAOSC) server. To
* subscribe (no fee) or UnSubscribe, please go to:
*
*

http://www.seaint.org/sealist1.asp
*
* Questions to seaint-ad@seaint.org. Remember, any email you
* send to the list is public domain and may be re-posted
* without your permission. Make sure you visit our web
* site at: http://www.seaint.org

******* ****** ****** ****** ******* ****** ****** ********