RE: UBC 1630.8.2.2.1.7 Bracing Load

Bill,
 
The city and county of LA requires the 2% at the intermediate bracing and 6% at the brace closest to the hinge point.
 
Ed Najjarine, SE
Irvine, CA

David Topete <dtopete@gfdseng.com> wrote:
Bill,
Similar to what Conrad posted, I've used 2% of the force that can be developed in the beam flange.  Say you are bracing a W12x35, Fy = 50 ksi, you would design the bracing force, Pbr = 0.02 x 0.6 x 50ksi x 6.5" x 0.5" = 1.95 kips (ASD).  I've kinda followed the '89 ASD Spec E4 regarding lacing of built-up members (pg 5-44 of the green book).  HTH
David A. Topete, SE

From: Conrad Harrison [mailto:sch.tectonic@bigpond.com]
Sent: Wednesday, October 03, 2007 5:46 PM
To: seaint@seaint.org
Subject: RE: UBC 1630.8.2.2.1.7 Bracing Load
 
I don't have the UBC but texts comparing various codes around the world indicate most codes usually adopt a value between 2% and 2.5% of the force in the critical flange.
 
Regards
Conrad Harrison
B.Tech (mfg & mech), MIIE, gradTIEAust
Adelaide
South Australia

From: Bill Allen [mailto:T.W.Allen@cox.net]
Sent: Thursday, 4 October 2007 10:01
To: seaint@seaint.org
Subject: UBC 1630.8.2.2.1.7 Bracing Load
 
In bracing the top and bottom flange of a steel beam, what force do I use to design the brace connection?
 
TIA,
 
T. William (Bill) Allen, S.E.
Consulting Structural Engineers
 
V (949) 248-8588 F(949) 209-2509