Andre,
Check with the jurisdiction, but, assuming you project is non-DSA or non-OSHPD, there will probably be only 3 items that will be different from ASCE-7. [For non-engineers: conventional wood frame construction requirements of IBC have been revised by HCD -- practically all projects of any size now require lateral calculations.]
1. Minimum value of Cs is revised (affects tall builidings only)
2. Builidng separation requirement is added (similar to UBC)
3. Concrete wall out-of-plane deflection of ACI is revised.
See-
There is no grace period after Jan 2008.
If you plan to submit using ASCE-7 ***before*** Jan 2008, I do not see why you can not convince them.
Suresh Acharya, S.E.
-----Original Message-----
From: Andre Sidler [mailto:asidler@hotmail.com]
Sent: Tuesday, November 06, 2007 2:22 PM
To:
Subject:
Fellow Listers -
I hear
I tried calling the LA Call Center and I didn't get any help.
Thanks,
Andre J. Sidler, P.E., S.E.
Quantum Consulting Engineers
------------------------------------------------------------------------
David A. Topete, SE
From: ndz28@aol.com [mailto:ndz28@aol.com]
Sent: Wednesday, November 07, 2007 11:16 AM
To:
Subject: Los Angeles City 2007 building codes.
Fellow engineers,
Does any one have any information on the new
We're 7 weeks away from the inception of the 2007 CBC and we're attempting to design our projects without knowing for sure what code to design for. ( Mind you I'm already handicapped for not understanding section 1609, wind loads, and I'm doing just as badly with the seismic part).
I can't even get a straight answer if the 2007 CBC will be accepted in
Thanks in advance.
Andrew Vidikan, PE