--Kipp Martin
Carollo Engineers
Portland, OR
>>> "Dave Adams" <davea@laneengineers.com> 12/27/2007 12:04 PM >>>
Hello everyone,
Those of you who deal with non-building structures: How are you
spending your time determining the fundamental period of flat-bottom
tanks (T-sub-i in ASCE 7-05, Section 15.7)? Are you actually modeling
and calculating the value or using simplified equations from material
standards (i.e. AWWA or API)? ASCE 7 appears to really discourage the
use of simplified equations.
Thanks,
Dave K. Adams, P.E., S.E.
LANE ENGINEERS, INC.
Tulare, CA 93274
******* ****** ******* ******** ******* ******* ******* ***
* Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
* This email was sent to you via Structural Engineers
* Association of Southern California (SEAOSC) server. To
* subscribe (no fee) or UnSubscribe, please go to:
*
*
http://www.seaint.org/sealist1.asp
*
* Questions to seaint-ad@seaint.org. Remember, any email you
* send to the list is public domain and may be re-posted
* without your permission. Make sure you visit our web
* site at: http://www.seaint.org
******* ****** ****** ****** ******* ****** ****** ********