-gm
On Dec 17, 2007 11:36 AM, Mark Pemberton < markpemberton@sbcglobal.net> wrote:
Kensington. They have a 30 day planning review that all plans must go through prior to any code checking.
Rhkratzse@aol.com wrote:In a message dated 12/17/07 10:10:58 AM, markpemberton@sbcglobal.net writes:
Sooner in many areas. I just did a job in the bay area and they required submittal by the end of November if the CBC was being used.
That sounds odd; which jurisdiction was that?
Ralph
**************************************
See AOL's top rated recipes (http://food.aol.com/top-rated-recipes?NCID=aoltop00030000000004)Mark Pemberton, S.E.
Pemberton Engineering
502 Mace Blvd., Suite 2B
Davis, CA 95616
Ph: (530) 792-0511
Fax: (530) 792-7109
--
-gm