Friday, December 7, 2007

Re: Perforated shear walls

Jeff Hedman wrote:
>
> Chuck,
>
> There was no strapping on the outside of the building, but it is
> possible that there could have been strapping on the inside. So your
> are saying that if the openings are treated like an opening in the
> diaphragm, then the height to width ratios no longer apply? Which all
> of the extra stuff to do calculate with perforated shear walls, and
> the reduction in shear capacity, is it ever really worth it to use them?
>
>
>
>
>
Take a look at Fig. 2305.3.5. You still need to consider ht./width
ratios. You need an analysis in either case--"rational" or the
"perforated shearwall" stuff in the Code. You still need hardware. Out
here in earthquake country I'm not comfortable with unreinforced
openings in the middle of my shearwalls--YMMV.
Chuck Utzman, PE

******* ****** ******* ******** ******* ******* ******* ***
* Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
* This email was sent to you via Structural Engineers
* Association of Southern California (SEAOSC) server. To
* subscribe (no fee) or UnSubscribe, please go to:
*
*

http://www.seaint.org/sealist1.asp
*
* Questions to seaint-ad@seaint.org. Remember, any email you
* send to the list is public domain and may be re-posted
* without your permission. Make sure you visit our web
* site at: http://www.seaint.org

******* ****** ****** ****** ******* ****** ****** ********