RE: Perforated shear walls

There is a limit of 490plf.  Above that they are not allowed.

 

Jason

 

 

-----Original Message-----
From: Bill Allen [mailto:t.w.allen@cox.net]
Sent: Thursday, December 06, 2007 5:36 PM
To: seaint@seaint.org
Subject: RE: Perforated shear walls

 

Even in high seismic regions?

 

T. William (Bill) Allen, S.E.

ALLEN DESIGNS

Consulting Structural Engineers
 
V (949) 248-8588 F(949) 209-2509

-----Original Message-----
From: Doug Mayer [mailto:doug.mayer@taylorteter.com]
Sent: Thursday, December 06, 2007 4:11 PM
To: seaint@seaint.org
Subject: RE: Perforated shear walls

 

Yes.

 

Doug Mayer, SE

Structural Engineer

 

 

From: Jeff Smith [mailto:jeffsmith7@comcast.net]
Sent: Thursday, December 06, 2007 4:04 PM
To: seaint@seaint.org
Subject: Perforated shear walls

 

I have never designed perforated shearwalls before and I am reviewing section 2305.3 of the 2007 CBC and the 2005 AWC design examples. Do understand correctly that a perforated shear wall meeting the requirements and subject to adjustment factors, can be designed with only end wall holdowns and no force transfer detailing around openings?

 

Jeff