Thursday, July 10, 2008

RE: PIle Cap Connection

In the past I have seen people use un stressed tendon in concrete diaphragms for collectors and drags.  The problem is that unstressed tendon is a lot more flexxible than stressed tendon or mild steel.  I will suggest that the provisions in the code are for tendons that are stressed.
I believe that the classical fix for your problem is to drill into the end of the pile and install mild steel bars embedded in epoxy grout.
Mark Gilligan

******* ****** ******* ******** ******* ******* ******* ***
* Read list FAQ at: http://www.seaint.org/list_FAQ.asp
*
* This email was sent to you via Structural Engineers
* Association of Southern California (SEAOSC) server. To
* subscribe (no fee) or UnSubscribe, please go to:
*
*

http://www.seaint.org/sealist1.asp
*
* Questions to seaint-ad@seaint.org. Remember, any email you
* send to the list is public domain and may be re-posted
* without your permission. Make sure you visit our web
* site at: http://www.seaint.org
******* ****** ****** ****** ******* ****** ****** ********