In sites where there are space constraints and tilt up construction is desired, is it possible to “Pancake” the panels?
That is form and pour a first panel (layer), then wait sometime and pour and another panel (layer) on top it and so on (up to say 4 or 5 layers).
If you have experience or thoughts on such a process, please share it with us.
Thanks
Bill