David:
Curing doesn't improve deflection, or vibration, or durability, or ...
Regards,
Stan
*************************************************
Structural engineering is the art of molding materials
we don't wholly understand, into shapes we can't fully
analyze, so as to withstand forces we can't really assess,
in such a way that the community at large has no reason
to suspect the extent of our ignorance." ...Jim Amrhein
*************************************************
Structural engineering is the art of molding materials
we don't wholly understand, into shapes we can't fully
analyze, so as to withstand forces we can't really assess,
in such a way that the community at large has no reason
to suspect the extent of our ignorance." ...Jim Amrhein
*************************************************
On Fri, May 22, 2009 at 10:27 AM, David Topete <d.topete73@gmail.com> wrote:
I guess the concrete needs time for curing, and the concrete sub needs time for healing...
On Thu, May 21, 2009 at 6:58 PM, Drew Morris <dmorris@bbfm.com> wrote:
And right before a 3 day weekend.....
Stan Caldwell wrote:Drew:Elevated one-way P/T slab designed for 7" thickness. ACI 117 has a tolerance of -0.25 in. Measured thickness as constructed of 6.00" to 6.50", with parts of the slab as thin as 5.13". This is an area of about 3,000 sf in a parking structure on a tight schedule, where all surfaces will be visually exposed. A decision will be made manana.Stan**********************************
The goal of every engineer is to retire
without getting blamed for a major
catastrophe! ...Dilbert
**********************************
On Thu, May 21, 2009 at 4:49 PM, Drew Morris <dmorris@bbfm.com> wrote:
So what happened at the jobsite?
--
David Topete, SE