That's going to be one drunk contractor this weekend!
-----Original Message-----
From: Stan Caldwell [mailto:stancaldwell@gmail.com]
Sent: Thursday, May 21, 2009 3:09 PM
To: seaint@seaint.org
Subject: Re: High Mast Light Pole DesignDrew:Elevated one-way P/T slab designed for 7" thickness. ACI 117 has a tolerance of -0.25 in. Measured thickness as constructed of 6.00" to 6.50", with parts of the slab as thin as 5.13". This is an area of about 3,000 sf in a parking structure on a tight schedule, where all surfaces will be visually exposed. A decision will be made manana.Stan**********************************
The goal of every engineer is to retire
without getting blamed for a major
catastrophe! ...Dilbert
**********************************
On Thu, May 21, 2009 at 4:49 PM, Drew Morris <dmorris@bbfm.com> wrote:
So what happened at the jobsite?