Dear colleagues,
A contractor has requested an alternate cold joint location. In the sketch found in the link below:
http://www.allendesigns.com/projects/20603/20603AlternateColdJoint.gif
Alternate A is the method shown on the approved plans.
Alternate B is what the contractor wants to do.
The dowels match the slab bars.
Should I have a concern about the request?
Regards,
T. William (Bill) Allen, S.E.
Consulting Structural Engineers