Re: Alternate Cold Joint Location

I will go with A. It is easier to form.

Alt. B may require a water stop at the joint. The L-shaped bar may cause problem in proper forming.

Rajendran

Bill Allen <T.W.Allen@cox.net> wrote:
Dear colleagues,
 
A contractor has requested an alternate cold joint location. In the sketch found in the link below:
 
 
Alternate A is the method shown on the approved plans.
 
Alternate B is what the contractor wants to do.
 
The dowels match the slab bars.
 
Should I have a concern about the request?
 
Regards,
 
T. William (Bill) Allen, S.E.
Consulting Structural Engineers
 
V (949) 248-8588 F(949) 209-2509