Hi guys,
What is the minimum embedment length of steel pipe piles allowed by the code?
I am looking at a 6” embedment in to my concrete cap and another 3” clear for my reinforcing steel above the pile but not certain if this is a rule of thumb or by the code. Can anybody confirm this?
Thanks,
Julius Micayas
Senior Lead Structural Engineer
![]()
Phone - 504-841-3014 (direct)
504 837-5275 (office)
Fax - 504-837-2986
e-mail: jmicayas@riverconsulting.com