Wednesday, July 18, 2007

Backstop Design


    I am in the process of designing a backstop for a high school athletic field.  100mph wind loading, 27'-5" high.  I determined my wind pressures using ASCE 7, assuming an epsilon of 0.192 (2x2 6 ga. mesh).  My average wind pressure (total force over area) came out to be around 17.7 psf, which for a cantilevered 27.5' post at 8' or 10' is huge.  I was originally assuming I would have 4" diameter schedule 40 post at 10' on center; but now I'm coming up with 8" A53 pipe at 8' on center.  Am I missing something?
 
 
 
 
Brian K. Smith, P.E.