Has the US NRC published a final report on the Crystal River Nuclear Powerplant delamination crack in the containment structure? Where is it available on line?
--
Georg A. M. Kralik, P.Eng.
Senior Civil/Structural Design Engineer
Ontario Power Generation (retired)
--
Georg A. M. Kralik, P.Eng.
Civil/Structural Design Engineer
416-481-6920 (no voice mail)
georg.kralik@gmail.com