Monday, October 24, 2011

RE: Infill opening in a tilt-up

Adjustable column  ties, top and sides.

 


From: Mark Johnson [mailto:markajohn@yahoo.com]
Sent: Thursday, October 20, 2011 12:17 PM
To: seaint@seaint.org
Subject: Infill opening in a tilt-up

 

I need to remove some 12'x12' roll-up doors in 6" concrete tilt-up panels and infill with CMU. 

The current idea is to leave the steel frame, weld A706 dowels at the sides and epoxy dowels at the bottom.  Then use bond beam units, drop in horizontal #4 bars and grout.  That would take care of the sides and bottom.

I need an Idea for tying the infill to the steel door frame at the top.  Suggestions?

Mark Johnson